CONTACT US ON
01204 676 370

English F A
National Football Centre

National Football Centre

Client – The FA / Derry Building Services

Construction Cost – £71 Million

Set in the National Forest in 330 acres of beautifully landscaped parkland, the centre is the training base for the 24 England teams.

The complex consists of a full-sized indoor third generation football pitch equipped with viewing gallery for up to 200 people, a 60m x 40m multi-purpose indoor sports hall, eleven full size outdoor pitches, one elite DESSO raining pitch which is an exact replica of Wembley, a running track, training hill, four sports pavilions for briefings and training analysis, some with catering and changing facilities and a sports medicine centre.

Included amongst the centre’s cutting edge facilities are a hydrotherapy suite, a human performance lab complete with altitude chamber, a functional rehabilitation gym, a strength and conditioning gym, a 60m 3 lane running track with video gait and biomechanical analysis, physiotherapy treatment rooms and doctors consulting rooms.

Also on site is a Hilton Hotel and a Hampton by Hilton Hotel offering a combined total of 228 air conditioned guest rooms, an executive lounge, health club and spa, 500 person capacity ballroom and conferencing facilities.

MWS (UK) Ltd successfully completed the commissioning and water treatment services on this project.